国产精品国产三级国产a,少妇特黄一区二区三区,精品人妻一区二区三,国产精品国产三级国产aⅴ中文

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

通風(fēng)管道加工設(shè)備中風(fēng)管常出現(xiàn)的問題

來源:http://www.888qp03.com/     發(fā)布時(shí)間:2020-08-21  

通風(fēng)管道加工是通風(fēng)和空氣調(diào)節(jié)系統(tǒng)的重要組成部分,大部分都是由風(fēng)管加工設(shè)備(如風(fēng)管生產(chǎn)線)制成??墒且?yàn)楦鞣N各樣的原因,可能導(dǎo)致風(fēng)管加工設(shè)備加工而成的風(fēng)管出現(xiàn)問題。
Ventilation duct processing is an important part of ventilation and air conditioning system, most of which are made by duct processing equipment (such as duct production line). However, due to various reasons, it may lead to problems in the air duct processed by air duct processing equipment.
1、加工資料未達(dá)標(biāo)
1. Processing data not up to standard
(1)表現(xiàn):板材外表不平整,厚度不均勻,有明顯的壓痕、裂紋、砂眼、結(jié)疤和銹蝕等狀況;風(fēng)管平面下沉,旁邊面向外凸起,有明顯的變形。
(1) Performance: the surface of the board is not smooth, the thickness is not uniform, there are obvious indentation, cracks, sand holes, scab and rust, etc.; the plane of the air duct sinks, the side faces to the outside, and has obvious deformation.
(2)影響:工作時(shí)風(fēng)管漏風(fēng),空調(diào)負(fù)荷增加,同時(shí)風(fēng)壽數(shù)和性能被影響。
(2) Impact: air leakage in the air duct, air conditioning load increases, and the number of air life and performance are affected.
(3)原因:資料不合格,不能滿意制造風(fēng)管的需求。
(3) Cause: the data is not qualified, and the requirement of manufacturing air duct is not satisfied.
(4)辦法:在使用風(fēng)管加工設(shè)備制造風(fēng)管前,要先檢查資料出廠合格證書和資料質(zhì)量證明還有外觀厚度等,確保資料是可用的。
(4) Method: before using the air duct processing equipment to manufacture the air duct, we should first check the data factory certificate, data quality certificate and appearance thickness to ensure that the data is available.
2、風(fēng)管翹角及彎頭角度不準(zhǔn)
2. Air duct warping angle and elbow angle are not accurate
(1)表現(xiàn):矩形風(fēng)管兩相對(duì)平面、兩端面不平行;折角不平直;對(duì)角線不相等;咬口不嚴(yán)。
(1) Performance: two relative planes and two end faces of rectangular air duct are not parallel; inflection angle is not straight; diagonal line is not equal; bite is not tight.


 
 
(2)影響:會(huì)使風(fēng)管連接受力不均勻,安裝后的風(fēng)管不平直,法蘭盤墊片不緊密,系統(tǒng)漏風(fēng),造成空調(diào)負(fù)荷損失,而且縮短使用壽數(shù)。
(2) Influence: it will make the air duct connection stress uneven, the air duct after installation is not straight, the flange gasket is not tight, the system air leakage, resulting in air conditioning load loss, and shorten the service life.
(3)原因:板下料放樣不準(zhǔn)確;風(fēng)管兩兩平行,相對(duì)面的板料長度和寬度不相等。
(3) Reasons: the layout of plate cutting is not accurate; the air duct is parallel to each other, and the sheet metal length and width on the opposite side are not equal.
(4)辦法:展開下料時(shí),應(yīng)對(duì)板料嚴(yán)厲角方,對(duì)每片板料的長度、寬度以及查驗(yàn)對(duì)角線,使它們的偏差控制在答應(yīng)范圍內(nèi);下料后的板料,應(yīng)將風(fēng)管相對(duì)面的兩片板料重合查驗(yàn)尺寸準(zhǔn)確性。
(4) Methods: when blanking, the sheet metal should be strictly angled, and the length, width and diagonal lines of each sheet should be checked to make their deviation within the allowable range; after blanking, the two sheets opposite to the air duct should be overlapped to check the dimensional accuracy.
以上便是關(guān)于山東通風(fēng)管道加工設(shè)備生產(chǎn)的風(fēng)管常出現(xiàn)的問題相關(guān)介紹,希望對(duì)您的生活提供有效幫助,感謝您的閱讀與支持,了解更多請(qǐng)持續(xù)關(guān)注我們。
The above is about Shandong ventilation duct processing equipment production of air duct problems related to the introduction, hope to provide effective help to your life, thank you for your reading and support, learn more, please continue to pay attention to us.

上一篇:濟(jì)南通風(fēng)管道加工的技術(shù)的優(yōu)勢是什么?
下一篇:如何提高通風(fēng)管道加工的質(zhì)量?

国产一区二区三区www| 无码人妻久久一区二区三区蜜桃| 偷窥偷拍美女如厕小便hd| 男人巨茎大战欧美白妇| 国产全肉乱妇杂乱视频| 国产精品对白一区二区三区| 国产又爽又黄的视频在线观看| 男人和女人爽爽爽视频| 国产一区二区三区免费播放| 久久久久久人妻精品| 18禁裸男晨勃露J毛免费观看| 熟妇高潮精品一区二区三区下载| av一区二区三区在线| 色哟哟精品观看| 国产精品久久久久久久三级 | 国产精品一区二区三区毛片| 中文字幕日韩av| 99蜜桃在线观看免费视频网站| 亚洲乱码在线观看| 日韩精品无码一本二本三本色| 日本强好片久久久久久aaa| 久久免费av| 成人av在线看| 精品无人码麻豆乱码1区2区 | 亚洲欧美性视频| 亚洲欧美日本在线| 大乳丰满人妻中文字幕日本 | 久久人妻av| 亚洲精品视频一二三区| 久久精品国产亚洲av拍拍拍| 国产又黄又粗又硬又爽又猛的视频 | av字幕在线| av在线免费播放观看| www.俺也去.com| 亚洲三级日韩| 97视频在线视频| 国产妇女馒头高清泬20p多| 喷水了…太爽了高潮视频| 青青草原在线伊人| 被黑人猛躁12次高潮不断电影| 97人妻人人揉人人躁原|